Most machines that fail in the first month failed in the factory first. The bearing that howls after two weeks was noisy on the test stand; the axis that drifts was already out of square. The difference is whether anyone measured it, wrote the number down, and looked at it twice.
This is the routine every machine goes through here before it is stripped, packed and loaded.
1. Frame and geometry
Welded frames are left to settle, then machined. Before assembly the bed is checked for flatness and the gantry for squareness — a diagonal measurement across the working area, not a visual check. On a 3015 laser that is a difference measured in hundredths of a millimetre, and it is written into the machine file.
2. Alignment and backlash
Every axis is run end to end and the backlash measured at both ends. Rails are checked for parallel error, and the rack or ballscrew for lost motion. This is the step that gets skipped when a factory is busy, and it is the step that produces the "it cuts a taper at one corner" complaint six months later.
3. Test cut with the customer's sample
Where the customer has sent material, the machine cuts it. Where they have not, we cut our own reference set in the same material class and keep the parts. This is the most useful thing a buyer can ask for: not a video of a machine cutting something, but the actual parts, photographed next to a ruler, with the parameters printed on the sheet.
4. The eight-hour run
Short test cuts hide thermal problems. A machine that runs for eight hours exposes them: a chiller that cannot hold temperature, a servo that drifts as the cabinet warms, a lens that fogs. We log the run, and the log goes with the machine file.
5. Strip, pack and photograph the packing
Before loading, the machine is photographed in its export packing, with the lifting points, the desiccant bags and the container layout visible. When a machine arrives with damage, those photographs decide the argument — and they have decided a few.
What you should ask for before shipping
Three things: the geometry and backlash readings, three test-cut parts from your material (or the nearest equivalent) photographed against a rule, and photographs of the packed machine. Any of the three is easy for a factory to produce and hard to fake. If a supplier cannot send them, the machine has probably not been tested beyond a short run.
If you are buying from anyone, ours included, ask for those three items before the balance payment. It is a reasonable request and the answer tells you a lot about how the machine was built.